Blocks can be produced: | Hollow/Solid/Paving Blocks, Kerbstone, etc. |
Cycle Time: | 40-45s |
Production Capacity (e.g.): | 400x200x200mm: 2560pcs/day(8 hours) |
400x150x200mm: 3200pcs/day(8 hours) | |
400x100x200mm: 34480pcs/day(8 hours) | |
Block Forming Mode: | Vibration |
E-mail: info@hf-industry.cn
Tel/WhatsApp: +8613663816343
Note: Block shapes and size can be customized
The whole design process consider principle of integrative reconciliation and the internal structure of a rational order, so the machine have great technical advantage, it adopt several new technique, such as box excitation, hydraulic discharge, omnidirectional automatically movement.
High quality: the whole machine is adopted high quality steel, and precision welding, the hydraulic system use high-quality components, so it have a longer life and less fault during work.
Low investment: high efficiency: this machine have several function features, such as low price, reliable performance, easy to operated, stable, more efficient, high output, low power consumption.the brick it produced have high density, high strength, accurate dimensional, good appearance,so it can reduce the customer's investment and production costs and give fast and large benefit.
Item | Specification |
Forming Cycle | 45 seconds |
Diesel Engine | 6 HP |
Pallet Size | No Need Pallet |
Frame Size | 2420x1320x1650mm |
Weight | 900kg |
Blocks can be produced | Hollow/Porous/Solid/Paving/Grass-planting Block, Kerbstone, etc. |
High Strength Structural Steel
To produce our machines, we use high-strength structural steel. Steel rank can be Q345 – 16Mn.
|
Top Brands Parts
If some parts need to be ordered from others, we must choose top brands to keep quality. |
Production Equipment
We have more than 90 sets various production equipments, CNC machine tools, Plasma Cutting Machine and Flame Cutting, Machine, Wire-electrode Cutting Machine, Fully-automatic Milling Machine, Milling and Washing Machine, Polishing Machine, etc. to guarantee quality. |
Designed workers
Different parts will be processed or manufactured by designed workers. If occur product defects, the designed workers should be responsible for it, even though machines have been delivered.
|
Welding
We have strictly welding demands. Welders must get National Welder Certificate. Welding lines should be uniform. Transition should be smooth.
|
Painting
Before painting, we must clean rust and oxide layer on the machines thoroughly. Then paint 4 layers. After above process, machines will be protected well from rust.
|
Copyright © 2025 Design by HONGFA INDUSTRY GROUP CO., LTD. All rights reserved.
Send Inquiry
Please leave the message you want to inquiry. We will reply you as soon as possible within 24 hours.